images Our Services
Request a
call back







    cf7captchaRegenerate Captcha

    images
    Do you have any
    questions?
    images
    01993 647089
    Head Office
    images
    Support Team

    Asbestos Surveys Nationwide


    The launch of the Control of Asbestos at Work Regulations 2002 introduced Regulation 4 ‘ The Duty to Manage Asbestos in Non Domestic Properties. (Revised 2006 & 2012) This new regulation created an explicit duty to assess and manage the risks from asbestos in premises. The risks will vary with circumstances, ranging from normal occupation of a building to the repair, refurbishment and demolition of a premises, and each property or site will need to be assessed by means of a survey. This assessment will be used to produce a management plan and risk assessments which details and records the actions to be undertaken to manage and reduce the risks from asbestos. HSG 264 Asbestos: The Survey Guide refers to two different types of survey: Management Surveys and Refurbishment & Demolition (R&D) Surveys.

    Asbestos Management Surveys

    A management survey is the standard survey. Its purpose is to locate, as far as reasonably practicable, the presence and extent of any suspect Asbestos Containing Materials (ACMs) to a building or site which could be damaged or disturbed during normal occupancy, including foreseeable maintenance and installation, and to assess their condition. Management surveys will often involve minor intrusive work and some disturbance. The extent of intrusion will vary between premises and depend on what is reasonably practicable for individual properties, i.e. it will depend on factors such as the type of building, the nature of construction, accessibility etc. A management survey should include an asbestos register and an assessment of the condition of the various ACMs and their ability to release fibres into the air if they are disturbed in some way. This ‘material assessment’ will give a good initial guide to the priority for managing ACMs on an annual or regular basis depending of the evaluation of the risks. The survey will usually involve sampling and analysis to confirm the presence or absence of ACMs. However a management survey can also involve presuming the presence or absence of asbestos. A management survey can be completed using a combination of sampling ACMs and presuming ACMs. Any materials presumed to contain asbestos must also have their condition assessed (i.e. a material assessment).

    Refurbishment and Demolition Asbestos Surveys (R&D)

    Prior to any works to a property or site, whether localised or full demolition is planned, an R&D Asbestos Survey is needed. This type of survey is used to locate and describe, as far as reasonably practicable, all ACMs in the area where the refurbishment work will take place or in the whole building if demolition is planned. The survey will be fully intrusive and involve destructive inspection, as necessary, to gain access to all areas, including those that may be difficult to reach. A refurbishment and demolition survey may also be required in other circumstances, e.g. when more intrusive maintenance and repair work will be carried out or for plant removal or dismantling. There is a specific requirement in CAR 2012 (regulation 7) for all ACMs to be removed as far as reasonably practicable before major refurbishment or final demolition, and does not cause a greater risk to employees than if the asbestos had been left in place. Removing ACMs is also appropriate in other smaller refurbishment situations which involve structural or layout changes to buildings (e.g. removal of partitions, walls, units etc.). Under CDM, the survey information should be used to help in the tendering process for removal of ACMs from the building before work starts. The survey report should be supplied by the client to designers and contractors who may be bidding for the work, so that the asbestos risks can be addressed. In this type of survey, where the asbestos is identified so that it can be removed (rather than to ‘manage’ it), the survey does not normally assess the condition of the asbestos, other than to indicate areas of damage or where additional asbestos debris may be present.

    However, where the asbestos removal may not take place for some time, the ACMs’ condition will need to be assessed and the materials managed. Refurbishment and demolition surveys are intended to locate all the asbestos in the building (or the relevant part), as far as reasonably practicable. It is a disruptive and fully intrusive survey which may need to penetrate all parts of the building structure. Aggressive inspection techniques will be needed to lift carpets and tiles, break through walls, ceilings, cladding and partitions, and open up floors. In these situations, controls should be put in place to prevent the spread of debris, which may include asbestos fibres. Refurbishment and demolition surveys should only be conducted in unoccupied areas to minimise risks to the public or employees on the premises. Ideally, the building should not be in service and all furnishings removed.

    For minor refurbishment, this would only apply to the room involved or even part of the room where the work is small and the room large. In these situations, there should be effective isolation of the survey area (e.g. full floor to ceiling partition), and furnishings should be removed as far as possible or protected using sheeting. The ‘surveyed’ area must be shown to be fit for reoccupation before people move back in. This will require a thorough visual inspection and, if appropriate (e.g. where there has been significant destruction), reassurance air sampling with disturbance. Under no circumstances should staff remain in rooms or areas of buildings when intrusive sampling is performed. There may be some circumstances where the building is still ‘occupied’ (i.e. in use) at the time a ‘demolition’ survey is carried out. For example in the educational sector, refurbishment/demolition surveys may be conducted in schools or colleges during one closure period (e.g. holidays) and the work not undertaken until the next holiday period. Also, a demolition survey maybe conducted to establish the economic future or viability of a building(s). The survey results would determine the outcome. In such situations, the ‘survey’ will need extremely careful managing with personnel and equipment/furnishings being decanted and protected (as necessary), while the survey progresses through the building. Again, there should be effective isolation of the survey areas and on completion the ‘surveyed’ area must be shown to be fit for reoccupation.

    Worried About Asbestos in Your Property? Contact Us Below

    If you feel your property needs an Asbestos Survey, then fill in the form below –

      What our clients say
      images Asbestos Management
      Get your
      instant quotes

        images
        Do you have any
        questions?
        images
        01993 647 089
        Head Office
        images
        Support Team
        Looking for a quality and affordable company
        to survey your premises for asbestos?

        We offer a fixed price service, irrespective of the amount of samples
        images
        © 2017 Amiantus - Web Marketing by Unity